Activate westside-contracts in Woodpecker CI #3

Closed
opened 2026-03-24 15:53:43 +00:00 by forgejo_admin · 0 comments

Type

Feature

Lineage

plan-wkq → Phase 14 → CI setup

Repo

forgejo_admin/westside-contracts

User Story

As a platform operator
I want westside-contracts to have a CI pipeline
So that builds and tests run automatically on push

Context

Repo was deployed manually (docker build + push). Woodpecker doesn't have the repo activated. .woodpecker.yml exists in the repo but isn't wired.

File Targets

  • Woodpecker admin: activate forgejo_admin/westside-contracts
  • Verify .woodpecker.yml pipeline runs successfully

Acceptance Criteria

  • Repo activated in Woodpecker
  • Push to main triggers pipeline
  • Tests run, image builds and pushes to Harbor

Test Expectations

  • Push a commit, verify pipeline runs
  • Run command: check Woodpecker UI

Constraints

  • Follow existing repo activation pattern

Checklist

  • Activated
  • Pipeline green
  • project-westside-basketball
  • westside-app #72
### Type Feature ### Lineage `plan-wkq` → Phase 14 → CI setup ### Repo `forgejo_admin/westside-contracts` ### User Story As a platform operator I want westside-contracts to have a CI pipeline So that builds and tests run automatically on push ### Context Repo was deployed manually (docker build + push). Woodpecker doesn't have the repo activated. `.woodpecker.yml` exists in the repo but isn't wired. ### File Targets - Woodpecker admin: activate `forgejo_admin/westside-contracts` - Verify `.woodpecker.yml` pipeline runs successfully ### Acceptance Criteria - [ ] Repo activated in Woodpecker - [ ] Push to main triggers pipeline - [ ] Tests run, image builds and pushes to Harbor ### Test Expectations - [ ] Push a commit, verify pipeline runs - Run command: check Woodpecker UI ### Constraints - Follow existing repo activation pattern ### Checklist - [ ] Activated - [ ] Pipeline green ### Related - `project-westside-basketball` - westside-app #72
Sign in to join this conversation.
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
forgejo_admin/westside-contracts#3
No description provided.